Project Description
Location: Kinlichee, AZ
Client: Bureau of Indian Affairs and the Navajo Nation
This project consisted of demolition of an old wooden bridge and constructing a new 100 foot single span bridge, with pre-stressed concrete beams and cast in place concrete superstructures and substructures. Both approaches of the bridge were paved and extensive wire enclosed rip rap installed around a wash with year-around flows.